# P272: Supporting Opus Energy customers to deliver complex industry change

- Link: https://imserv.com/case-studies/p272-supporting-opus-energy-customers-to-deliver-complex-industry-change/
- Published: 2019-05-01T17:30:50+00:00

In 2017, one of the biggest changes to the way that UK electricity was settled since
the development of the electricity pool to the way that UK electricity was settled
was introduced, in the form of the implementation of Modification P272.

Over 5 years in the making (having been first introduced as a Modification in 2011),
P272 moved larger B2B electricity meters in Profile class 5-8 to half hourly settlement,
the first significant step towards the Mandatory Half Hourly Settlement programme
we see today. 

It also signalled a significant change in the way that traditional Half Hourly data
was handled, meaning that businesses with B2B portfolios had to take steps to go
through the Change of Measurement class process to move meters from Monthly Register
reads to Half Hourly interval data, massively increasing the volume of meter data
they had to handle.

Greater granularity of settlement data passing through the settlement system would
lead to great accuracy in customer billing, an important measure for delivering 
the service that Ofgem expects of energy retailers. Getting it wrong could lead 
to significant regulatory attention or even fines – and suppliers are also ranked
on their settlement accuracy scores, meaning settlement performance couldn’t slip
through the migration process.

As the metering data experts, IMSERV were perfectly placed to support customers 
through the often-complex requirements of preparing for the new half hourly P272
world. Our specialist industry team offered training for the metering and settlement
teams within Opus Energy as well as carrying out key activities to ensure all the
right meters migrated correctly.

The migration itself involved ensuring we held all the correct site information 
for all meters, including the contact details for the user, as well as making sure
all sites were dialling correctly. This was critical as any broken or non-dialling
meters couldn’t be migrated so the team had to identify issues and carry out fixes
both remotely and via site visits to make sure all meters could migrate within the
required timeframe.

IMSERV also had to deliver the change of Measurement Class required as part of P272.
This meant de-appointing the site in the Non Half-Hourly market and reappointing
it into the new Half Hourly market, making sure that the meter has the right configuration
and handling all the technical requirements of a complex change of meter details.
In most cases this could be performed remotely, but some sites required a site visit
to manual adjust the data. 

With interoperability providing such a challenge to the market, we spent a great
deal of time engaging with other Agents, Suppliers and End Users to ensure a successful
migration for our customers.

**Andy Nash, Operations Director at Opus Energy, said** _“IMSERV’s support and knowledge
of the process, alongside their industry expertise has helped so much.  We are delighted
that IMSERV is helping maintain our P272 project plan requirements for Ofgem. There
have been challenges as the window to meet the deadline for the change of measurement
class has been tight, and we really appreciate the way that IMSERV has been able
to take sites on at short notice and support us with the changes – enabling us to
continue to meet our project plan and obligations.” _